Nathan Wheat of Roanoke Homes and Renovations wanted to build a duplex in Northeast Roanoke. He told Cardinal News this spring that the permit took eight months, and that neighboring jurisdictions generally issued permits in one or two weeks.
That duplex shows the gap between Roanoke's zoning rules and what has actually been built. The city's 2024 zoning rewrite made duplexes, townhomes and cottage courts legal on streets that used to allow only single-family homes. Building them still meant getting through a short-staffed permit office, under rules that City Council has sent back for review again and again.
The rules changed in 2024. New homes didn't follow.
In March 2024, City Council passed a citywide rezoning that ended single-family-only zoning. It allows townhomes, cottage courts and small apartments in neighborhoods that had been reserved for detached houses. A group of residents sued, city planning staff reviewed the package, and Council adopted it again in September 2024, as WSLS and Cardinal News have reported.
In Residential 7 districts, the minimum lot area per home was 7,000 square feet in 2023. The 2024 rules cut it to 2,000 square feet.
Here's what came of it. Planning director Catherine Gray told Council in July that the zoning changes added 45 housing units between March 2024 and March 2026. Cardinal News reported that the city had originally estimated 40 additional units a year, so two years produced a little over half of what was projected. The city hasn't broken the 45 down into duplexes, cottages or apartments. Across a whole city, though, 45 homes over two years means most single-family blocks look the way they did before.
The permit office set the pace
Gray's count matches what builders were saying at the same time. In May 2026, Cardinal News reported that the planning department was 20 positions short, about a third of its staff. Mayor Joe Cobb compared approval times of about three weeks before the pandemic with the three to six months builders were then waiting. Builder Steve Fowler of Lost Art Construction described six weeks for a deck addition and months for other home additions.
The city then hired outside consultants, Municipal Insights LLC and Blue Heron Leadership Group LLC, to assess the department. Their report is dated July 15, and Cardinal News covered its presentation to Council in September.
| Snapshot | What was reported |
|---|---|
| May 2026 | Department 20 positions short; builders waiting three to six months, per the mayor |
| Summer 2026 report | Vacancy rate reached 36%; more than 400 permits in the pipeline, about a third of applications not yet issued |
| Same report | Seven completed building projects couldn't open without certificates of occupancy; one residential plans examiner covered the whole city |
| July 3 to Aug. 7, 2026 | Permits waiting fell from 337 to 215 |
| September 2026 | Delays down from 5 to 6 weeks to 1 to 2 weeks, per Assistant City Manager Lavar Youmans; department short 10 people instead of 20 |
Because Roanoke's process was more cumbersome than its neighbors', the consultants wrote, the problem was urgent:
"Investment tends to follow the path of least resistance."
With permit waits that long, a duplex that's legal on paper can still take most of a year to get started, which helps explain why the 45-unit count came in below the city's estimate. The same timeline matters for a buyer who has no plans to build anything new. If you're buying a Roanoke house planning to add a deck, finish a basement or build an addition after closing, the permit timeline is part of that plan. Youmans described "steady progress" in September, and the 1-to-2-week figure comes from that presentation. If your timeline depends on it, ask the city for current wait times before you commit.
Builders also faced rules that kept changing
The permit backlog grew while the rules themselves were under review. That made it harder for anyone to plan a small multi-unit project. Here's the sequence as Cardinal News and WSLS have reported it:
- March 2024: Council adopts the citywide rezoning that ends single-family-only districts.
- Later in 2024: After a lawsuit from residents, staff revises the package and Council adopts it again.
- 2025: New council members take office, and some ask staff to review the density rules again.
- August 2025: The plaintiffs in one of the two suits drop their case, and a plaintiff in the other says that group won't pursue further legal action, according to Cardinal News.
- Spring 2026: Staff brings a revised plan. It would raise the minimum lot area per unit, cut the maximum number of units per lot in some districts, require one parking space per unit for apartment buildings with three or more units, and require a property survey for a new building or an accessory dwelling unit. The Planning Commission recommends it unanimously.
- July 6, 2026: Council votes 4 to 3 to send the density pieces back for another review. The package goes back together with a proposal from a citizens' group whose roughly six authors include former city planning chief Evelyn Slone.
The citizens' proposal falls between the 2023 and 2024 rules. It would set the Residential 7 minimum at 2,500 square feet per unit, allow fewer homes per lot, add 2,000 square feet to the Residential 12 minimum and require parking on corner lots. City Manager Valmarie Turner told Council that another full review would be "extremely difficult" with the planning department short-staffed. That's the same department working through the permit backlog.
WSLS reported that the July vote left the 2024 ordinance in effect. So the rules have allowed more since 2024, while the city has spent two years considering whether to allow less. For a small builder deciding whether to buy a lot for a triplex, that uncertainty is a cost too.
A seven-cottage court in Old Southwest needed a rezoning anyway
The clearest new example of small-scale infill went through a rezoning, not the 2024 rules. It sits at 0 Janette Avenue SW in Old Southwest.
The parcel was originally a diamond-shaped traffic-calming island called Calvin Place. Building the Roy L. Webber Expressway in the 1970s cut it down to a triangle, and it later passed into private ownership. Today it's about half an acre of mostly grass, bordered by Janette Avenue, a private street and the expressway. Its Recreation Open Space zoning didn't allow homes at all, so the owner applied to rezone it to RM-2 for a cottage court: five cottages along one property line and two in the southwestern corner, arranged around a central courtyard.
The Planning Commission recommended approval on October 13, and City Council adopted the rezoning 7 to 0 on October 19, 2026. The site is in the H-2 Historic Neighborhood Overlay District, so the Architectural Review Board has to approve the exterior design before a building permit application goes to the city.
The site is an unusual leftover parcel, and it went through a public process. The city's staff report lists the notice steps: legal ads, letters to abutting owners, a sign on the property and email notices to subscribers.
How to read a Roanoke street before you make an offer
For a buyer comparing the city with Roanoke County, Salem or Botetourt, here's how I'd use all this:
- Look at the parcels around the house. The zoning map shows zoning designations. Vacant lots, odd triangles left by road projects, and lots already headed for rezoning are places to watch for change.
- Check the Planning Commission page. Rezonings like the one on Janette Avenue are posted with staff reports and hearing dates on the city's Planning Commission page. You can also subscribe to CivicSend notices.
- Plan renovations around the permit timeline. If a deck, an addition or an accessory unit is part of why you're buying, find out current wait times before you count on a move-in date.
- On new construction, ask about the certificate of occupancy. This summer's consultants' report found finished buildings that couldn't open without one.
- Expect the density rules to come up again. Council sent them back for review in July, leaving the 2024 ordinance in effect.
This is general information about public records and local reporting, not legal advice. If you're relying on what a specific lot allows, confirm it with the city's planning staff or a land-use attorney.
Quick answers
Does Roanoke still have single-family-only zoning? No. The 2024 ordinance removed it citywide. WSLS reported that the July 2026 Council vote left those rules in effect while the density changes went back for review.
How many homes have the 2024 changes produced? 45 units from March 2024 through March 2026, according to the city's planning director, not broken down by type.
Are permits faster now? In September 2026, city officials reported that typical delays had dropped from 5 to 6 weeks to 1 to 2 weeks, and the department was down to 10 open positions.
If you're weighing a house in the City of Roanoke and want to know what's planned on the lots around it, or how a renovation would fit the current permit timeline, let's connect. Lisa Santacaterina and The Community Roanoke team can pull the public records and planning agendas for the streets you're considering.